You are here: Agreements > Supply Agreement > 50MW Wind Turbines Equipment Supply Contract

SITE SEARCH
AGREEMENTS / CONTRACTS
(optional)
(optional)
Try our advanced search >>
CLAUSES Search Contract Clauses >>
Browse Contract Clause Library>>

50mw Wind Turbines Equipment Supply Contract

Supply Agreement

Legal Documents
You are currently viewing:

 This Supply Agreement involves

GC CHINA TURBINE CORP. | Da Qing Long Jiang Wind Power Ltd | Wuhan Guo Ce Nordic New Energy Ltd

. RealDealDocs™ contains millions of easily searchable legal documents and clauses from top law firms. Search for free - click here.
 

Title: 50MW Wind Turbines Equipment Supply Contract
Date: 4/15/2010

join now
50 of the Top 250 law firms use our Products every day

 

Da Qing Long Jiang Wind Farm Project

 

50MW Wind Turbines Equipment Supply Contract

 

 

 

This document is a summary translation of key terms only from the original contract that is written in Chinese.  It is a summary, not a complete translation, and not all words or meanings may have the same effect as in the original contract .

 

 

 

 


 

 

Date: August 30, 2007

 

Venue: Wuhan

 

1.

Definition

 

1.1.

“Buyer” means Da Qing Long Jiang Wind Power Ltd.

 

1.2.

“Supplier” means Wuhan Guo Ce Nordic New Energy Ltd.

 

2.

Contract

 

2.1.

This contact should include manufacturing, transportation, installation, testing, successful production and quality assurance of wind turbines equipment (towers are not included). This contract should also include all the accessories equipment, replacement parts, specialized tools, blue prints, technical support, training and all the technical documents to ensure the installation, testing, training, technical support, operation and maintenance.

 

2.2.

Condition of equipments delivery: The equipments should be delivered to buyer at the project site. Supplier should be responsible for the train/ship arrangement to deliver the equipments to the site that designated by the buyer.

 

3.

Products and equipments

 

3.1.

Suppler to should supply the following equipments to the buyer:

 

3.1.1.

1 st batch should include:

 

No.

Equipment name

Type

Units

Delivery date

Venue

1

Wind turbines

DW1.0/56

10

4 Ms aft. the signing date

Project site

2

Centralized surveillance system

DW-CT02

1

4 Ms aft. the signing date

Project site

3

Replacement parts

 

1

4 Ms aft. the signing date

Project site

4

Consumable products

 

1

4 Ms aft. the signing date

Project site

5

Specialized tools

 

1

4 Ms aft. the signing date

Project site

6

Training (domestic)

 

120ppls days

2 Ms aft. the signing

Wuhan

7

Training (oversea)

 

30ppls days

2 Ms aft. the signing

Sweden

8

Installation and testing

 

 

1 Week aft. equipment delivery

Project site

9

Technical support

24 months

 

After installation

Project site

10

Technical documents

 

10

Prior to signing contract

Project site

11

Transportation and insurance