Back to top

TECHNOLOGY TRANSFER AGREEMENT

Receivables Purchase Transfer Agreement

TECHNOLOGY TRANSFER AGREEMENT | Document Parties: DRAGON PHARMACEUTICAL INC | Shanxi Weiqida  Pharmaceutical  Co., Ltd.,  | Yanlin Han You are currently viewing:
This Receivables Purchase Transfer Agreement involves

DRAGON PHARMACEUTICAL INC | Shanxi Weiqida Pharmaceutical Co., Ltd., | Yanlin Han

. RealDealDocs™ contains millions of easily searchable legal documents and clauses from top law firms. Search for free - click here.
Title: TECHNOLOGY TRANSFER AGREEMENT
Date: 3/2/2005
Industry: Biotechnology and Drugs     Sector: Healthcare

TECHNOLOGY TRANSFER AGREEMENT, Parties: dragon pharmaceutical inc , shanxi weiqida  pharmaceutical  co.  ltd.   , yanlin han
50 of the Top 250 law firms use our Products every day

 

                                                                   Exhibit 10.24

                                                               Portions redacted

                                     * Certain information on this page has been

                                        omitted and filed separately with the

                                       Securities and Exchange Commission.

                                       Confidential treatment has been requested

                                        with respect to the omitted portions.

 

 

                          TECHNOLOGY TRANSFER AGREEMENT

 

                         Made this 18 day of April, 2002

 

                                     BETWEEN

 

Shanxi Weiqida   Pharmaceutical   Co., Ltd., herein represented by Mr. Yanlin Han,

hereinafter referred as "SW" , is a company registered under the laws of CHINA

 

                                       AND

 

Alpha Process Trust Reg., herein   represented by Giorgio   Calogero,   hereinafter

referred as "AP", is a company registered under the laws of LIECHTENSTEIN

 

 

1.    PREAMBLE

 

     1.1   SW is   dedicated   to set up a plant   ("Plant")   in   China   to   produce

          Cephalosporin C Potassium or Cephalosporin C Sodium ("the Product"), a

          pharmaceutical chemical intermediate;

 

     1.2   AP   possesses   the   latest   industrial    technology   to   produce   "the

          Product".

 

     1.3   AP has agreed to supply to SW the process   know-how and   assistance to

          realize the   production at SW Plant of the Product by using the latest

          technology it possesses.

 

     1.4   The parties therefore agree that AP shall supply such process Know-how

          including the process and technical   assistance to SW on the following

          terms and conditions.

 

2.    PRODUCTS AND PROCESSES

 

     2.1   The Products covered by this Agreement is Cephalosporin C Potassium or

          Cephalosporin C Sodium

 

     2.2   The   final   Product,   Clavulanate   Potassium,   will   comply   with   the

          specification of Appendix 1 (a) and 1 (b).

 

3.    Plant

 

     The plant will be designed by AP in accordance with 9 (nine)   fermentors of

     156 m3, and will meet the production capacity of 1,044,000 kg Cephalosporin

     C per year (365 days).

 

<PAGE>

 

4.    Technology and Services Supplied by AP

 

     AP will supply:

 

     4.1   Fermentation process and relevant maintenance   documents to ensure the

          production in industrial plant and laboratory.

 

     4.2   Detailed   step-by-step    description   of   the   process   (fermentation,

          extraction,    and   recycling)   in   industrial    plant   production   and

          laboratory.

 

     4.3   Specification in the process of production.

 

     4.4   List   and   specifications   of all   equipment   (equipment   construction

          drawings provided by the relevant manufactures)

 

     4.5   Assistance   in   equipment   procurement   from   different   international

          suppliers.

 

     4.6   Analytical methods and quality specification for raw materials, finish

          products and intermediates.

 

     4.7   Preliminary    construction   drawings   for   workshop,   and   layout   for

          equipment   installation   (detailed drawings for all workshops provided

          by a local design institute).

 

     4.8   Preliminary   flow-sheets   of the   process   (detailed   flow-sheets   and

          installation drawings provided by local design institute).

 

     4.9   Inspection during equipment installation.

 

     4.10 Inspection during pilot validation.

 

     4.11 Requirements and specifications of utility systems.

 

     4.12 Preliminary project information,   technical parameters, and process of

          dissolvent recycling.

 

     4.13 List   and   specifications   of   laboratory   equipment   (   about   3/5 m3

          fermentor and extraction equipment in laboratory size).

 

     4.14 Process   improvement and technology   development   within 2 years after

          starting production.

 

     4.15 A project team to cooperate with SW.

 

                                       2

<PAGE>

 

5.    Verification Technical Parameters

 

     In case that SW follows all AP's instruction and technology   supplied by AP

     under this Agreement,   SW shall obtain the following   production   technical

     parameters:

 

     5.1   Technical Parameters

 

          Following   AP's   process,   SW shall   obtain   the   following   technical

          parameters:

 

          Fermentation   yield = more than * * * kg product per m3 per   fermentor

          per month

 

          Extraction yield = more than * * *

 

     5.2   Guaranteed Parameters:

 

          AP guarantees that SW shall obtain the following parameters:

 

          5.2.1      Fermentation of   Cephalosporin C: more than * * * kg product

                    per m3 per fermentor per month

 

          5.2.2      Extraction   yield:   more   than * * * kg of   Cephalosporin   C

                    Potassium from *** kg Cephalosporin C

 

          5.2.3      Extraction yield of Cephalosporin C Sodium is equal to * * *

                    of Cephalosporin C Potassium

 

     5.3   The Cephalosporin C Potassium produced with AP's technology shall meet

          the standards specified in Appendix 1.

 

     5.4   The quantities of raw materials necessary for the production of 1kg of

          Product are specified in Appendix 2.

 

     5.5   The times of AP personnel   visiting SW Plant are specified in Appendix

          3.

 

6.    SERVICES TO BE PROVIDED BY SW

 

     SW will provide or perform following services at no cost to AP.

 

     6.1   Organize a project team with engineers,   chemists and biologists which

          shall   receive and use the process   documentation   supplied by AP. The

          number of the   persons   of the team may be   increased   to meet   future

          requirement.

 

  *** CONFIDENTIAL MATERIAL REDACTED AND SEPARATELY FILED WITH THE COMMISSION.

 

                                       3

<PAGE>

 

     6.2   Purchase in due time all the equipment in   accordance   with the lists,

          specifications   and relevant drawings of such equipment which shall be

          confirmed by AP. Procure all relevant   services to finalize the design

          regarding civil   engineering and   installation of the equipment.   Such

          design should be based on the basic   documentation and   specifications

          as provided by AP under this Agreement.

 

     6.3   Procure in due time all the raw materials and reagents of the required

          specifications for production and laboratory test.

 

     6.4   Arrange jobs in accordance with the specifications   supplied by AP, so

          that at the various phases of the   implementation of the project,   the

          personnel   which is   required by AP, is   available   and trained in due

          time to be familiar with project,   equipments,   and   instruments.   The

          personnel referred to above include engineers, chemists,   technicians,

          foremen and workers.

 

     6.5   Equipment drawings will be provided by manufacturer specified by


 
SITE SEARCH

AGREEMENTS / CONTRACTS

Document Title:

Entire Document: (optional)

Governing Law:(optional)


Try our advanced search >>
 

CLAUSES

Search Contract Clauses >>

Browse Contract Clause Library>>

Get Email Updates
Email:
This is only a partial view of this document. We have millions of legal documents and clauses drafted by top law firms. learn more search for free browse for free learn more