Back to top

Lease Contract

Lease Agreement

Lease Contract | Document Parties: Chengdu Gaoxin Construction Development Co., Ltd | Fiberxon (Chengdu) Technology Co., Ltd. You are currently viewing:
This Lease Agreement involves

Chengdu Gaoxin Construction Development Co., Ltd | Fiberxon (Chengdu) Technology Co., Ltd.

. RealDealDocs™ contains millions of easily searchable legal documents and clauses from top law firms. Search for free - click here.
Title: Lease Contract
Date: 10/8/2009
Industry: Semiconductors     Sector: Technology

Lease Contract, Parties: chengdu gaoxin construction development co.  ltd , fiberxon (chengdu) technology co.  ltd.
50 of the Top 250 law firms use our Products every day

 

Exhibit 10.31

 

Contract No.: FIBCDDBO8-0012

Administration Department of

Fiberxon (Chengdu) Technology Co., Ltd

 

Lease Contract on Standard Factory Buildings in

Sichuan Chengdu Export Processing Zone

 

Contract No.:

 

Party A (Landlord):

Chengdu Gaoxin Construction Development Co., Ltd.

Party B (Tenant):

Fiberxon (Chengdu) Technology Co., Ltd.

Party C (Administrator):

Administration Office of Sichuan Chengdu Export Processing Zone

 

In according with the Contract Law of the People’s Republic of China and pertinent rules and regulations, Party A, Party B and Party C have reached an agreement through friendly consultation and shall be bound by the following terms and conditions. Party A hereby appoints Party C to manage its standard factory buildings in Sichuan Chengdu Export Processing Zone (West Side) and lease them to Party B for its use. Party B hereby agrees to rent the standard factory buildings of Party A. Party A and Party C shall exercise their rights and perform their obligations respectively according to the terms and conditions under the Contract on Entrusted Operations of Standard Factory Buildings and Supervised Warehouse signed by them.

 

1.          Location of the Leased Workshops:

 

The leased workshops are located in the Standard Factory Building Area of Sichuan Chengdu Export Processing Zone (West Side) and include the whole of No.2 Building and the second floor as well as the reception hall on the first floor of No.5 Building.

 

2.         Area of the Leased Workshops:

 

The area of the leased workshops leased by Party B is 17,571 square meters (among which, No.2 Building covers 13,638 square meters, the second floor and the first floor of No.5 Building occupies 3,852 square meters and 81 square meters respectively. In case of any errors arising from the area of the leased workshops, the actually measured area shall be taken as valid). Plain-view drawings of the leased workshops shall be regarded as the appendix to this Contract.

 

3.          Lease Term:

 

3.1        The lease term shall be 60 months from January 15, 2008 to January 14, 2013.

 

3.2        No party shall change the terms and conditions hereof during the terms of the lease before Parties A, B and C reach unanimity through consultation.

 

4.          Current Status of the Leased Workshops:

 

Party A and Party C guarantee that Party A has all the rights and powers to lease the foregoing factory buildings and land and has the power to sign this Contract on behalf of any and all of the owners of the buildings (if any) or competent authorities of housing and land administration. Party A and Party C guarantee that there is no existing or potential litigation, arbitration, disputes or other legal proceedings concerning the land and buildings leased and remised by Party A. And there is no mortgage on the land and factory buildings owed to any banks, companies or individuals, nor any lease contract except this one and any rights and interests of any third parties.

 



 

5.          Purpose of the Leased Workshops:

 

5.1        The leased workshops shall be limited to the purposes of manufacturing, processing, dealing with related business and warehousing which Party B has been approved to undertake.

 

5.2        Party B shall notify Party C in writing 60 days prior to the expiration of this Contract in the event that it intends to extend the lease. Under the same terms Party B shall have the priority to lease the leased workshops. In this case, a new lease shall be concluded between the parties. In case that Party B has already been using the leased workshops before renewing the lease contract, the lease term shall be calculated from the date when the leased workshops was actually put into use by Party B. The rent for the extended lease shall not be higher than the price level estimated by professional organizations mutually recognized by Party A and Party B under the same conditions of the current market.

 

6.          Rent, Property Management Fee and Payment:

 

Rent and property management fee shall be calculated based on the construction area.

 

6.1        Rent:

 

6.1.1     Party A and Party C shall grant Party B 90 days of rent-free for decoration from January 15, 2008 to April 14, 2008.

 

6.1.2     Monthly rent shall be 10RMB/m² from April 15, 2008 to April 14, 2010.

 

6.1.3     Monthly rent shall be 15RMB/m² from April 15, 2010 to January 14, 2013.

 

6.2.       Party B shall pay 0.5% of the amount overdue as penalties every day in the event that the rent payment is delayed over one working day.

 

6.3        The property management fee shall be 1.5 RMB/m² every month and shall be calculated starting from April 15, 2008.

 

6.4        The rent and property management fee shall be paid on a monthly basis. Party B shall pay rent and property management fee for the current lease month (either in cash or by check and check amount shall have been deposited into the bank account). Payment shall be made before the 10 th  of every month. Party C shall transfer the non-operating receipts or invoices issued by Party A to Party B within 15 working days after Party A’s receipt of the payment.

 

Bank Account Number designated by Party A for Party B’s payment: 51001406137050111277

Account Name: Chengdu Gaoxin Construction Development Co., Ltd.

Issuing Bank: Gaoxin Branch of China Construction Bank

 

6.5        Party A or Party C shall not charge any parking fee for motor vehicles of Party B and its employees.

 

7.          Guarantee:

 

7.1        Party B shall pay a lease guarantee of RMB 80,000 (eighty thousand RMB in total) to Party A within 5 days from the date of signing this Contract. The guarantee shall be refunded by Party A to Party B in a lump sum upon the expiration date of this lease provided that Party C confirms, upon inspection and acceptance, that Party B has not damaged the building structure, changed the outside façade images and the interior layout of the factory buildings during the lease term. Party A shall issue a financial receipt for the guarantee.

 

The bank account number, name of the account and issuing bank designated by Party A for Party B making

 



 

payments shall be consistent with the provisions under Article 6.4.

 

7.2        Within 5 working days after the date of the delivery of the workshops, Party B shall pay water and electricity deposit of 5 RMB/square meter to Party C according to the area of the workshop. This deposit shall total RMB 87,855 (RMB eighty-seven thousand eight hundred and fifty-five). The deposit shall be refunded by Party C to Party B in a lump sum on the expiration date of this lease provided that Party C verifies and confirms that Party A has not owed any water and electricity fees and overdue fine during the lease term.

 

Bank Account Number designated by Party C to Party B for payments: 511610015018001658252

 

Name of Account: Financial Centralized Receipt and Payment Center of Chengdu Gaoxin District (Export Processing Zone)

 

Issuing Bank: Gaoxin Branch of Communication Bank of China

 

8.          Status and Delivery Time of the Leased Workshops:

 

8.1        Status of the Workshops at the time of the Delivery:

Within 90 working days from the date of signing this Contract, Party A and Party C shall make sure that the workshops meet the following conditions:

 

8.1.1     The external walls have been re-painted;

 

8.1.2     The waterproof has been repaired and there exists no water leakage;

 

8.1.3     The elevators are in place and ready for use. The elevators are required as follows:

 

There are two elevators installed in the Building 2 and one elevator installed at the specified position in Building 5 by Party B. All the foresaid elevators shall be freight elevators with a load capacity of no less than 2,800 kilograms.

 

8.1.4     Party A and Party C shall ensure that electricity supply in Building 2 and Building 5 is in good condition. Within 90 working days from Party B’s provision of relevant technical parameters about the transformer to Party A and Party C, Party A and Party C shall complete the configuration of the power and make it available and Party C shall ensure power supply during Party B’s decoration.

 

The requirements for power specified by Party B are as follows:

 

Building 2 and Building 5 shall receive power from different transformers.

 

A specific-purpose transformer shal


 
SITE SEARCH

AGREEMENTS / CONTRACTS

Document Title:

Entire Document: (optional)

Governing Law:(optional)


Try our advanced search >>
 

CLAUSES

Search Contract Clauses >>

Browse Contract Clause Library>>

Get Email Updates
Email:
This is only a partial view of this document. We have millions of legal documents and clauses drafted by top law firms. learn more search for free browse for free learn more