EXHIBIT 2.1
|
AIA Document G701-2001
|
Owner ý
|
|
Change Order
|
Architect ý
|
|
|
Contractor ý
|
|
|
Field ý
|
|
|
Other o
|
|
PROJECT ( Name and address )
|
CHANGE ORDER NUMBER:
|
002
|
|
|
HARD ROCK HOTEL & CASINO
|
|
|
777 BEACH BOULEVARD
|
DATE:
|
March 3, 2005
|
|
|
BILOXI, MS 39530
|
|
|
|
|
|
|
|
|
TO CONTRACTOR ( Name and address )
|
ARCHITECT’S PROJECT NC
|
23020
|
|
|
ROY ANDERSON CORP
|
CONTRACT DATE:
|
December 24, 2003
|
|
|
PO BOX 2
|
CONTRACT FOR
|
Hard Rock Construction
|
|
|
GULFPORT, MS 39502
|
|
|
|
|
|
|
|
|
THE CONTRACT IS CHANGED AS
FOLLOWS
|
|
|
1 Spa Support Structure -
Modified existing structure to support Spa Equipment
|
82,233
|
|
|
|
|
|
|
2 Waveload Impact
|
549,091
|
|
|
|
|
|
|
3 Revised Porte Cochere Steel
Structure
|
422,753
|
|
|
|
|
|
|
4 EIFS Union
Requirement
|
278,525
|
|
|
|
|
|
|
5 Additional Painting and
Finishes Requirement
|
847,279
|
|
|
|
|
|
|
6 Added Water Surface and Spa
At Pool Club Area
|
44,400
|
|
|
|
|
|
|
7 Exterior Cladding for Porta
Cochere - EIFS and Metal Panels
|
481,493
|
|
|
|
|
|
|
8 Additional Soft Flooring
requirement
|
150,593
|
|
|
|
|
|
|
9 Modified Structural Steel @
Loading Dock Area to Allow for Truck Clearance
|
115,896
|
|
|
|
|
|
|
10 Brace Frames
Modification
|
34,501
|
|
|
|
|
|
|
11 Foam block for Raised Seating @
HRL
|
62,610
|
|
|
|
|
|
|
12 Guitar Sign Foundation
|
83,387
|
|
|
|
Total
|
3,152,761
|
|
|
|
|
|
|
The Original Contract Sum Was
|
$
|
81,957,183
|
|
The Net Change By Previously Authorized Change
Orders
|
$
|
3,640,933
|
|
The
|
|