BECHTEL CORPORATION SABINE PASS LNG PROJECT ENGINEER, PROCURE AND CONSTRUCT (EPC) SUBCONTRACT

Engineering Procurement and Construction Contract

BECHTEL CORPORATION 

 

SABINE PASS LNG PROJECT 

 

ENGINEER, PROCURE AND CONSTRUCT (EPC) SUBCONTRACT 
You are currently viewing:
This Engineering Procurement and Construction Contract involves

MATRIX SERVICE CO

. RealDealDocs™ contains millions of easily searchable legal documents and clauses from top law firms. Search for free - click here.
Title: BECHTEL CORPORATION SABINE PASS LNG PROJECT ENGINEER, PROCURE AND CONSTRUCT (EPC) SUBCONTRACT
Governing Law: Texas     Date: 8/17/2005
Industry: BLDSRV    

Search Engineering Procurement and Construction Contract by:

Document Title:

Entire Document: (optional)

50 of the Top 250 law firms use our Products every day
Lump Sum Turnkey Agreement
Table of Contents

EXHIBIT 10.34

 

BECHTEL CORPORATION

 

SABINE PASS LNG PROJECT

 

ENGINEER, PROCURE AND CONSTRUCT (EPC) SUBCONTRACT

 

 

 

 

 

 

 

 

Subcontractor:

  

DIAMOND LNG LLC

  

Subcontract

Number:

  

25027-HC1-MTD0-00002

 

 

 

 

Address:

  

1221 McKinney

One Houston Center, Suite 3330

Houston, Texas 77010

  

Address:

  

3000 Post Oak Blvd

Houston, Texas 77056 V

 

 

 

 

Contact:

  

Mr. Sam Saita

Vice President

  

Contact:

  

Mr. Fred Sieling

Subcontract Manager

 

 

 

 

Telephone:

  

713/652-9250

  

Telephone:

  

713/235-3234

 

 

 

 

Facsimile:

  

713/652-9346

  

Facsimile:

  

713/235-1610

 

 

 

 

 

  

 

  

G&S Code

  

MTD0

 

 

 

 

and:

  

MATRIX SERVICE INC.

  

 

  

 

 

 

 

 

Address:

  

10701 E. Ute Street

Tulsa, OK 74116-1517

  

 

  

 

 

 

 

 

Contact:

  

Mr. John Newmeister

Vice President

  

 

  

 

 

 

 

 

Telephone:

  

918/838-8822

  

 

  

 

 

 

 

 

Facsimile:

  

918/838-0782

  

 

  

 

 

This “Subcontract” is dated as of the Sixth (6th) day of May, 2005, between Bechtel Corporation, (CONTRACTOR), and Diamond LNG LLC and Matrix Service, Inc. (SUBCONTRACTOR) who hereby agree that all Work specified below, which is a portion of the goods and services to be provided by CONTRACTOR for CHENIERE (OWNER), shall be perfored by the SUBCONTRACTOR in accordance with all the provisions of this Subcontract, consisting of the following Subcontract Documents:

 

Subcontract Form of Agreement, 06 May 2005

Exhibit “A” General Conditions, 06 May 2005

Exhibit “B” Special Conditions, 06 May 2005

Exhibit “C” Quantities, Pricing and Data, 06 May 2005

Exhibit “D” Scope of Work, Rev. 001, 27 April 2005

Exhibit “E” Technical Specifications and Drawings, Rev. 001, 12 April 2005

 

Page 1 of 2


Table of Contents

1.

WORK TO BE PERFORMED: Except as specified elsewhere in the Subcontract, SUBCONTRACTOR shall furnish all plant; labor; materials; tools; supplies; equipment; transportation; supervision; technical, professional and other services; and shall perform all operations necessary and required to satisfactorily:

 

    

Engineer, Procure and Construct Three (3) LNG Tanks

 

2.

SCHEDULE: The Work shall be performed in accordance with the dates set forth in the Exhibit “B” clause titled COMMENCEMENT, PROGRESS AND COMPLETION OF THE WORK.

 

3.

COMPENSATION: As full consideration for the satisfactory performance by SUBCONTRACTOR of this Subcontract, CONTRACTOR shall pay to SUBCONTRACTOR compensation in accordance with the prices set forth in Exhibit “C” and the payment provisions of this Subcontract.

 

4.

JOINT AND SEVERAL OBLIGATIONS: In signing this Subcontract Diamond LNG LLC and Matrix Service, Inc. agree that they shall be jointly and severally obligated to CONTRACTOR to fulfill all the SUBCONTRACTOR’s obligations and responsibilities set forth herein on a joint and several basis.

 

5.

LIABILITY FOR WORK PERFORED DURING LIMITED NOTICE TO PROCEED-(LNTP) – Any part of the Work carried out by the Subcontractor (or their Affiliates) pursuant to the LNTP issued on 3 February 2005, shall with effect from the Effective Date be treated as though such part had been carried out under the Subcontract and all terms and conditions set out in the Subcontract shall apply in respect to any such part of the Works and any payments made under the LNTP shall be deemed to have been made under this Subcontract as part of the Subcontract price.

 

This Subcontract embodies the entire agreement between CONTRACTOR and SUBCONTRACTOR and supersedes all other writings. The parties shall not be bound by or be liable for any statement, representation, promise, inducement or understanding not set forth herein.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTRACTOR:

  

 

  

SUBCONTRACTOR:

 

 

 

Bechtel Corporation

  

 

  

Diamond LNG, LLC

 

 

 

 

 

 

Authorized

Signature:

 

/s/ J. J. Sheehan


  

 

  

Authorized

Signature:

 

/s/ Sam Saita


 

 

 

 

 

 

 

 

Print Name:

 

J. J. Sheehan

  

 

  

Print Name:

 

Sam Saita

 

 

 

 

 

 

 

 

Print Title:

 

Sup OG&C (Ops)

  

 

  

Print Title:

 

Vice President

 

 

 

 

 

 

 

 

 

 

  

 

  

 

  

Matrix Service Inc.

 

 

 

 

 

 

 

 

 

  

 

  

 

  

Authorized

Signature:

 

/s/ Brad Rinehart


 

 

 

 

 

 

 

 

 

  

 

  

 

  

Print Name:

 

Brad Rinehart

 

 

 

 

 

 

 

 

 

  

 

  

 

  

Print Title:

 

VP-MWBU

 

Page 2 of 2


Table of Contents

BECHTEL CORPORATION

 

SABINE PASS LNG TERMINAL PROJECT

 

EXHIBIT “A”

 

ENGINEER, PROCURE AND CONSTRUCT (EPC) SUBCONTRACT

 

GENERAL CONDITIONS

 

TABLE OF CONTENTS

 

 

 

 

 

 

GC


  

Title


  

Page


GC-1

  

INDEPENDENT CONTRACTOR

  

3

GC-2

  

AUTHORIZED REPRESENTATIVES

  

3

GC-3

  

NOTICES

  

3

GC-4

  

SUBCONTRACT IMPLEMENTATION AND INTERPRETATION

  

3

GC-5

  

ORDER OF PRECEDENCE

  

4

GC-6

  

STANDARDS AND CODES

  

4

GC-7

  

LAWS AND REGULATIONS

  

4

GC-8

  

PERMITS

  

5

GC-9

  

TAXES

  

5

GC-10

  

LABOR, PERSONNEL AND WORK RULES

  

5

GC-11

  

COMMERCIAL ACTIVITIES

  

6

GC-12

  

PUBLICITY AND ADVERTISING

  

7

GC-13

  

SAFETY AND HEALTH

  

7

GC-14

  

ENVIRONMENTAL REQUIREMENTS

  

8

GC-15

  

SITE CONDITIONS AND NATURAL RESOURCES

  

10

GC-16

  

DIFFERING SITE CONDITIONS

  

10

GC-17

  

TITLE TO MATERIALS FOUND

  

11

GC-18

  

SURVEY CONTROL POINTS AND LAYOUTS

  

11

GC-19

  

SUBCONTRACTOR’S WORK AREA

  

11

GC-20

  

CLEANING UP

  

12

GC-21

  

COOPERATION WITH OTHERS

  

12

GC-22

  

RESPONSIBILITY FOR WORK, SECURITY AND PROPERTY

  

12

GC-23

  

SUBCONTRACTOR’S PLANT, EQUIPMENT AND FACILITIES

  

13

GC-24

  

ILLUMINATION

  

14

GC-25

  

USE OF COMPLETED PORTIONS OF WORK

  

14

GC-26

  

USE OF CONTRACTOR’S CONSTRUCTION EQUIPMENT OR FACILITIES

  

15

GC-27

  

FIRST AID FACILITIES

  

15

GC-28

  

INSPECTION, QUALITY SURVEILLANCE, REJECTION OF MATERIALS AND WORKMANSHIP

  

15