Statement of Work #
Mininet Campaign testing
Phase
1. INTRODUCTION
This Statement of Work #
(“SOW”) is made this day of
December 2008 by and between Elektrobit Inc.
(“Elektrobit” or “EB”) and TerreStar
Network Inc. (“TerreStar” or “TNS”) for the
PDA reference phone testing against the Mininet system, and is
covered by Master Development and Licensing Agreement between
Elektrobit and TerreStar dated August 10, 2007, as amendment
(“Agreement”).
2. REFERENCES
[1] Starbase AS-NAS 5bcd Integration
Camp Test Specification.doc
[2] Stargate Mininet Campaign
RF&HW Test Plan.doc
[3] Stargate Mininet Campaign
Application Level Test Specification.doc
3. PROJECT
OVERVIEW
At the time of writing this SOW, the
Satellite launch is scheduled to June 2009. Considering options for
system testing, TSN chose the Mininet to be used for PDA reference
phone system level testing in satellite mode. The primary goal in
this testing is to verify terminal operation in satellite mode and
gather design feedback for next FF#1.3 build.
The main objectives of this SOW are
divided to the following work packages:
WP1- Repeating modem tests with
Physical layer SW, without SAT delay conditions
([***])
[***]
WP2- FF#1.2 HW/RF testing,
without SAT delay conditions ( [***]
[ *** ]
WP3- Repeating tests with
Physical layer SW, with SAT delay conditions (
[***] 0
[ *** ]
WP4- Application Level Testing
and speech quality measurement ( [***] )
[***]
[***]
WP5- On-site support and link
person for Hughes Network System team ( [***] )
[***]
4. PERIOD OF
PERFORMANCE
Based on the planned schedule this
work will extend for a period of approximately [***] months,
starting [***] and ending [***].
5. SCHEDULE
The following table includes the
target schedule for Mininet Campaign testing activities.
[***]
|
|
|
|
|
|
|
|
|
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
6. TERRESTAR FURNISHED ITEMS
The following table
list Terrestar Furnished Items to Elektrobit which originate from
Program Parties or 3 rd Parties.
Mininet Campaign Terrestar Furnished
Items:
[***]
7. EB DELIVERABLES
The following list represents
Elektrobit deliverables. The Deliverables are based on inputs from
other Program Parties and EB activities during Mininet
Campaign.
EB deliverables:
[***]
8. PROJECT DEPENDENCIES AND
ASSUMPTIONS
The following table lists some but
not all of the Mininet Campaign dependencies and assumptions during
the milestones M0-M4. These inputs will work as enablers for EB
work and have an effect on the schedule, cost and quality of EB
support. Dependencies are indicated a D and Assumptions with an
A.
|
|
|
|
|
|
|
|
Category
|
|
Description
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
|
|
|
[***]
|
|
|
|
|