Title: Master Development and Licensing Agreement
Date: 5/6/2009
Industry: Communications Services     Sector: Services

Master Development and Licensing Agreement, Parties: terrestar corp , elektrobit inc , terrestar networks inc
50 of the Top 250 law firms use our Products every day

Exhibit 10.5

Pursuant to 17 CFR 240.24-b, confidential information has been omitted in places marked “[***]”

and has been filed separately with the Securities and Exchange Commission pursuant to a

Confidential Treatment Application filed with the Commission

Statement of Work #         

TerreStar Antenna Feasibility Study

This Statement of Work #      (“SOW”) is made this      day of November 2008 by and between Elektrobit Inc. (“Elektrobit” or “EB”) and TerreStar Networks Inc. (“TerreStar” or “TSN”) for the development of 15 EB reference phones with the integrated [***] antenna., and is governed by the Master Development and Licensing Agreement dated August, 2007 (“Agreement”)

 

1

Introduction

This SOW defines the scope of technical work to be performed by EB for the development of [***] EB reference phones, and integration of those phones with antennas developed by [***] Ltd. (“[***]”).

 

2

Project Overview

The main objective of this work is to successfully integrate this [***] antenna into EB and TSN’s reference design handset and perform antenna testing. The secondary objective is to support [***] transmit and receive antenna design, development and validation work for TSN’s S-band to provide satellite usage performance that meets or exceeds specified objectives. The final objective of this work is to document antenna and handset level guidance for design and implementation for industrialization into a wide variety of products.

 

3

Period of Performance

It is expected that this work will extend for a period of approximately [***] months. Officially starting on or around [***] and targeted to be completed on or around [***]. There will be break on work, while waiting for [***] phone.

 

4

Schedule

High Level Project Schedule:

This development and delivery schedule for this work will be reviewed and mutually agreed. A high level overview of the schedule is below.

 

EB Antenna SOW V3 TSN 8-13-08

26 August 2008

  

Page 1 of 7


Table 1 Schedule for [***]

 

Milestones

  

Target Date

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

  

[***]

  

[***]

  

[***]

  

[***]

  

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

Table 2 Schedule for FF1 Rev 2

  

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

[***]

  

[***]

  

 

EB Antenna SOW V3 TSN 8-13-08

26 August 2008

  

Page 2 of 7


5

TerreStar Furnished Items

The following items must be delivered by TSN in order for EB to provide the deliverables set for in Section 6 below. The items listed in this Section 5 are considered to be TerreStar Furnished Items and Third Party Contributions, as defined in the Agreement:

 

 

1)

Overall project management

 

 

2)

Simulation and test results of the antenna element

 

 

3)

Full [***] antenna in device evaluation

 

 

4)

Mechanical specifications of the antenna (dimensions, weight, connections points and etc.)

 

 

5)

Design guidance for antenna integration and position into StarGate FF1 prototype

 

 

6)

Normal technical support to EB to assist in device level design and testing (daily communication, possible on-site support)

 

 

7)

[***] Antenna assembly (element + coaxial cable) samples and assembly for the manufactured prototypes (This allows for placement of [***] handset upfront, [***] spare antennas and [***] extra antennas for future HW rounds)

 

 

8)

The target antennas shall be center Transmit frequency of [***] and target center Receive frequency of [***]

 

 

9)

Antenna tuning work for all manufactured antennas

 

 

10)

Documented antenna level specifications for design and implementation, including capability of industrialization.

 

6

EB Deliverables

EB will provide the following deliverables to TSN:

[***]

 

7

Project dependencies and assumptions

The following table lists some but not all of the project dependencies and assumptions. These inputs will work as enablers for EB work and have an effect on the schedule, cost and quality of EB Deliverables. Dependencies are indicated with a D and Assumptions with an A.

 

EB Antenna SOW V3 TSN 8-13-08

26 August 2008

  

Page 3 of 7


Item #

  

Category

  

Description

1.

  

[***]

  

[***]

[***]

  

[***]

  

[***]

[***]

  

[***]

  

[***]

[***]

  

[***]

  

[***]

[***]

  

[***]

  

[***]

[***]

  

[***]

  

[***]

[***]

  

[***]

  

[***]

[***]

  

[***]

  

[***]


 
SITE SEARCH

AGREEMENTS / CONTRACTS

Document Title:

Entire Document: (optional)

Governing Law:(optional)


Try our advanced search >>
 

CLAUSES

Search Contract Clauses >>

Browse Contract Clause Library>>

Get Email Updates
Email:
This is only a partial view of this document. We have millions of legal documents and clauses drafted by top law firms. learn more search for free browse for free learn more