Back to top

HOMELAND ENERGY SOLUTIONS, LLC NEW HAMPTON PROJECT ? PROJECT DEVELOPMENT ASSISTANCE SCOPE OF WORK

Development Agreement

HOMELAND ENERGY SOLUTIONS, LLC
NEW HAMPTON PROJECT ? PROJECT DEVELOPMENT ASSISTANCE
SCOPE OF WORK | Document Parties: Econo-Power International Corporation | Hill & Associates | HOMELAND ENERGY SOLUTIONS, LLC You are currently viewing:
This Development Agreement involves

Econo-Power International Corporation | Hill & Associates | HOMELAND ENERGY SOLUTIONS, LLC

. RealDealDocs™ contains millions of easily searchable legal documents and clauses from top law firms. Search for free - click here.
Title: HOMELAND ENERGY SOLUTIONS, LLC NEW HAMPTON PROJECT ? PROJECT DEVELOPMENT ASSISTANCE SCOPE OF WORK
Date: 3/19/2007

HOMELAND ENERGY SOLUTIONS, LLC
NEW HAMPTON PROJECT ? PROJECT DEVELOPMENT ASSISTANCE
SCOPE OF WORK, Parties: econo-power international corporation , hill & associates , homeland energy solutions  llc
50 of the Top 250 law firms use our Products every day
 
Exhibit 10.13
Burns &
McDonnell logo
HOMELAND ENERGY SOLUTIONS, LLC
NEW HAMPTON PROJECT — PROJECT DEVELOPMENT ASSISTANCE
SCOPE OF WORK
1.0 INTRODUCTION
The scope of work described herein is to support Homeland Energy Solutions, LLC (HES) in project development activities for a single 100 Million gallon ethanol and co-product development facility using a coal gasification facility as the source of energy. The plant is located near New Hampton, Iowa. Burns & McDonnell (B&Mc) will serve as HES contact for this effort and will utilize professionals from Hill & Associates (H&A) and Econo-Power International Corporation (EPIC) in supporting the completion of this effort. The term “Project Team” used in this document shall refer to selected personnel from B&Mc, EPIC, and H&A.
2.0 SCOPE OF WORK
Listed below are tasks pertaining to scope of work for this project. Not discussed below are scheduled meetings with the Project Team and HES personnel. These meetings will take place about ever four (4) weeks in Mason City or New Hampton and will discuss status, open issues, etc.
2.1 Task 1 — Trip to China
EPIC will set up the details of a trip to China to visit facilities currently operating coal-burning gasifiers. Visits to at least two facilities will be arranged for as many finance and project personnel as needed. The purpose of this trip will be to verify the operating record, performance, costs, etc. of coal-burning gasification facilities identical or very similar to that proposed for the HES New Hampton project.
2.2 Task 2 — Development of Front End Loaded (FEL II) Detailed Cost and Preliminary Design Engineering
B&Mc will perform design and FEL II level cost estimates (when applicable) for the Balance of Plant (BOP) items outside the gasifier. Deliverables will include the following:
    Overall Site Plan
 
    Coal Handling System
 
    Rail Loop / Spur
 
    Preliminary Balance of Plant Piping and Instrumentation Diagrams including: Cooling Water System, Plant Air System, Steam System, Fire Protection System, Sulfur Loadout, Water Treatment, Natural Gas Interconnection
 
    One Line Diagrams for BOP Systems
 
    Preliminary Building Layouts

 


 
Burns &
McDonnell logo
EPIC will perform design and FEL level cost estimates (when applicable) for the gasifiers.
Deliverables will include the following:
    Process Flow Diagram
 
    Design Basis Description
 
    Material Balances (design case and guarantee case)
 
    Piping and Instrumental Diagrams
 
    Electrical Single Line Diagrams
 
    General Arrangement Drawings
 
    Equipment Data Sheets
 
    Equipment List
 
    FEL II level Estimates or Gasifier Engineering, Equipment, and Materials and Construction
 
    Gasifier General Arrangements
 
    Operating Data
 
    Bar Chart Construction Schedule
2.3 Task 3 — Refinement of Coal Supply and Transportation Options
This effort work will include identifying and meeting with coal suppliers, railroads, barge companies, and coal terminal operators to work out a potential coal supply chain and coal source or sources. Third party coal suppliers may be identified and contacted as well in order to obtain the most economic supply chain. One or two of the nearby utility plants identified in the original study will be contacted to ascertain their ability to supply coal.
Determining the best coal supply to the New Hampton plant will be an iterative process that will require diligence and working through all of the potential steps. Some of these will be dead ends while some will provide potential and after the pursuit of the options with potential, a best choice or combination of choices that provides the best economics can be arrived at.
Initial work will be via phone and e-mail; however, meetings with potential prospects will be required in some cases.
Coal Supply — H&A will identify the potential coal sources in the Wyoming Powder River Basin that can most economically supply the HES New Hampton Plant. The coal suppliers

 
SITE SEARCH

AGREEMENTS / CONTRACTS

Document Title:

Entire Document: (optional)

Governing Law:(optional)


Try our advanced search >>
 

CLAUSES

Search Contract Clauses >>

Browse Contract Clause Library>>

Get Email Updates
Email:
This is only a partial view of this document. We have millions of legal documents and clauses drafted by top law firms. learn more search for free browse for free learn more