Statement of Work #
StarComm Product Implementation
Phase
1. INTRODUCTION
This Statement of Work #
(“SOW”) is made this
day of April 2009 by and between Elektrobit Inc.
(“Elektrobit” or “EB”) and TerreStar
Networks Inc. (“TerreStar” or “TSN”) for
the StarComm (Commercial ATC/SAT PDA) product development
implementation phase (milestones M1-M2) activities, and is covered
by Master Development and Licensing Agreement between Elektrobit
and TerreStar dated August 10, 2007, as amended
(“Agreement”). Capitalized terms that are not otherwise
defined in this SOW have the meaning defined in the
Agreement.
2. PROGRAM
OVERVIEW
The main objective of the Commercial
ATC/SAT PDA program (hereafter referred to as
“StarComm”) is to specify, design, develop and validate
the commercial PDA capable of operating on the TerreStar’s
S-band network, [***].
The StarComm Product development is
a joint effort between [***], who collectively will be referred to
in this SOW as the “Program Parties”.
TerreStar has the responsibility to
define product requirements, operator service definitions and to
accept Industrial Design (ID) and specifications to be used for the
StarComm Product and their shipments. In addition TerreStar and EB
shall define overall requirements for product demand-supply concept
and accept the final procedure. When design is verified prior to
commercial production, Terrestar shall review and approve the
cosmetic design of the device including logoing and other external
messaging.
Elektrobit is responsible for
product main system integration, design validation and
manufacturing. Hughes is responsible to provide satellite modem
hardware (excluding satellite RF) and satellite modem software as
well as satellite testing systems to be used in product
development.
The main input document for the
StarComm product development is the TerreStar Commercial PDA Phone
Product Description (Starcomm Commercial Phone Product
Description.doc, v2.4.0, Jan 30, 2009) and TerreStar Requirement
Specification (StarComm Requirements.xls, v1.0, Mar 25, 2009) which
are mutually approved by TerreStar and Elektrobit at M1 milestone
and the changes to these documents are also mutually agreed using
the Change Management Process.
Elektrobit will clarify requirements and
specifications for the StarComm Product according to product and
testing requirements received from TerreStar and through
consultation with the Program Parties.
This SOW covers the items for the
[***].
[***]
The work packages, representing the
work effort of development activities, are following:
[***]
WP1: [***]
This work package includes tasks to
be performed by EB during the [***] for the following
activities:
[***]
WP2: [***]
This work package includes [***]
including
[***]
The following documents are used as
baseline for the execution of the tasks with this work package
between M1 and M2 milestones. The documents are approved by EB and
TerreStar at M1 milestone. All changes to the tasks, documents or
product must be mutually agreed between EB and TerreStar. Documents
are updated according to corresponding changes.
[***]
WP3: [***]
This work package includes [***]
with the following tasks
[***]
The following documents are used as
baseline for the execution of the tasks with this work package
between M1 and M2 milestones. The documents are approved by EB and
TerreStar at M1 milestone. All changes to the tasks, documents or
product must be mutually agreed between EB and TerreStar. Documents
are updated according to corresponding changes.
[***]
WP4: [***]
This work package includes [***].
The listed documents are used as baseline for the execution of the
tasks with HW, mechanics and SW implementation between
M1
Page 2 of 10
and M2 milestones. The documents are
approved by EB and TerreStar at M1 milestone. All changes to the
tasks, documents or product must be mutually agreed between EB and
TerreStar. Documents are updated according to corresponding
changes.
[***]
[***]
[***]
[***]
WP5: [***]:
EB performs [***]. The following
documents are used as baseline for the execution of the tasks with
verification, validation (including Terrestar User Acceptance
Testing) and pre-operator testing implementation between M1 and M2
milestones. [***]. The documents below were approved by EB and
TerreStar within the M1 development effort. All changes to the
tasks, documents or product must be mutually agreed between EB and
TerreStar. Documents are updated according to corresponding
changes.
[***]
WP6: [***]
This work package includes tasks for
[***].
The listed documents are used as
baseline for the execution of the tasks with this work package
between M1 and M2 milestones. The documents are approved by EB and
TerreStar at M1 milestone. All changes to the tasks, documents or
product must be mutually agreed between EB and TerreStar. Documents
are updated according to corresponding changes.
[***]
[***]
[***]
[***]
3. PERIOD OF
PERFORMANCE
Based on the planned schedule the
period of performance for work to be performed by EB under this SOW
is approximately [***].
4. SCHEDULE
Page 3 of 10
The following table includes the target schedule
for StarComm product development. In addition to main milestones
(M1, M2) there are several review milestones, where a separate TSN
review and decision is needed for the further actions after the
corresponding review milestone (e.g. decision for related
investment). EB shall schedule a review of these critical milestone
documents at most 3 days after release to TerreStar and shall
receive signoff from Terrestar within 7 days of release to
TerreStar (unless issues are unresolved at that time).
StarComm Product development program
target milestone schedule
|
|
|
|
|
|
|
|
Milestone
or Phase
|
|
ID
(EB)
|
|
Description
|
|
Target
Date
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
[***]
5. TERRESTAR FURNISHED
ITEMS
The following table list Terrestar
Furnished Items to Elektrobit which originate from Program Parties
or 3 rd
Parties.
StarComm Product program
implementation phase, Terrestar Furnished Items:
Page 4 of 10
|
|
|
|
|
|
|
|
|
|
|
|
Input for
the
Work
Package(s)
|
|
TerreStar Furnished
Item
|
|
Milestone
|
|
Responsible
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
|