Statement of Work #
Desert Campaign Testing
Phase
1. INTRODUCTION
This Statement of Work #
(“SOW”) is made this day of
March 2009 by and between Elektrobit Inc. (“Elektrobit”
or “EB”) and TerreStar Network Inc.
(“TerreStar” or “TSN”) for the PDA
reference phone testing (“Handset”) against the
TerreStar Satellite Network and is covered by Master Development
and Licensing Agreement between Elektrobit and TerreStar dated
August 10, 2007, as amended
(“Agreement”).
2. REFERENCES
[1] Statement of Work Mininet
Campaign Testing Phase
[2] Desert Campaign handset Test
Procedures (EB)
[3] FCC test requirement
25.252 & 25.149 for ATC (TSN)
[4] Test team travel schedule (EB)
(Desert Campaign Travel Costs 0.0.2.xls)
[5] Desert Campaign SOW WBS
0.0.10.xls
3. PROJECT
OVERVIEW
At the time of writing this SOW, the
TerreStar-I Satellite launch is scheduled for 28th of May, 2009 and
TSN has estimated that available handset testing period is 15 days
after the launch and will last 4 days. The schedule for this
project will be adjusted per the actual satellite
launch.
The purpose of this SOW is to define
a scope of work for EB to develop, finalize and document first VOIP
handset testing procedure against Terrestar-I satellite. This
procedure shall be verified with TSN team.
The objectives of this SOW are
divided to the following work packages (WP):
WP1- [***]
The WP1 include a preparation work
for Desert Campaign test period.
There are following preconditions
for WP1:
[***]
In this Work Package, EB
shall:
[***]
EB shall nominate team members and a
main point of contact or PM for desert campaign testing at
M0.
TerreStar shall:
[***]
The goals for this WP are
following:
[***]
WP2- [***]
The WP2 include
[***].
There are two preconditions for
WP2:
[***]
In this Work Package, EB
shall:
[***]
The goals for this WP are
following:
[***]
WP3- Desert Campaign summary and
reporting
The WP3 include reporting and data
review work.
In this Work Package, EB
shall:
[***]
The goal for this WP is as
following:
[***]
4. PERIOD OF
PERFORMANCE
Based on the planned schedule this
work will extend for a period of approximately [***]
.
5. SCHEDULE
The following table includes the
target schedule for Desert Campaign testing activities.
[***]
|
|
|
|
|
|
|
|
Work Packages
linkage
|
|
EB
Milestone
|
|
Description
|
|
Target Date
|
|
|
|
|
|
|
|
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
|
[***]
|
6. TERRESTAR FURNISHED
ITEMS
The following table list Terrestar
furnished items to Elektrobit which originate from Program Parties
or 3 rd
Parties.
Desert C