Exhibit 10.1
Dobrinski
Brothers Inc.
R.R. #1 Box 482-B Falls, PA 18615
Erosion and Sedimentation Control Proposal
Submitted to:
Re:
Blue Ridge Real Estate Company
Erosion Control
P.O. Box 707
Golf Course @ Jack Frost Blakeslee, PA 18610-0707
Dobrinski Brothers, Inc. will
provide for necessary equipment, supplies and personnel for the construction of
all Erosion and Sedimentation Control plans and Land clearing from contract
prepared by R.K.R Hess on Feb 10th 2005.
A.
Mobilization/ Demobilization
B.
Assuring that the approved
erosion and sediment control plan is properly and completely implemented
according to R.K.R Hess's plans & approved by R.K.R Hess and signed off on
by Golf Strategies, LLC.
C.
Implementing appropriate best
management practices to eliminate the potential for accelerated erosion and
sediment pollution from any discovered unforeseen circumstances.
D.
Constructing the grass and rock
swales, sediment traps, and basins to the designed specifications by RKR Hess
& approved by RKR Hess upon completion and billing invoicing signed off on
by Golf Strategies, LLC.
E.
All disturbed areas are to clean
of debris prior to turnover. Golf Strategies must sign off on before golf hole
is turned over to the Barbaron Construction. (tree limbs removed, loose rock
removed, branches etc.)
F.
Installing culverts, headwalls,
and outlets to the designed specifications by RKR Hess and approval of Golf
Strategies, LLC.
G.
Hauling excess unclassified
material from basins to designated areas as agreed by R.K.R Hess and Golf
Strategies.
H.
Responsibility to inspect all
erosion and sedimentation control after each run-off event and or on a weekly
basis.
I.
Keeping site areas and road areas clean and neat free from
all debris
and garbage. Road ways must be kept clean.
Initialed:
/s/ KD
/s/ EDD
/s/ TW
Dobrinski
Blue Ridge
Golf Strategies
Pg. 1
Misc items to be followed:
1.
All surveying for construction
layout shall be provided by Blue Ridge. Once hole has been staked out by Blue
Ridge and stakes knocked out will have to be replaced by contractor
2.
Blue Ridge Real Estate Co. shall
pay Dobrinski Brothers, Inc. time
And materials for the maintenance of all erosion and sedimentation
Controls until the hole has been turned over to Golf Strategies.
Dobrinski Brothers, Inc must provide to Golf Strategies and Hourly Rate
sheet for both labor and equipment to maintain the sediment control area IF
NEEDED prior to turning over to Golf Strategies. The rate sheet MUST be
approved PRIOR to any work being completed.
3.
If Barbaron Inc. damages the
E&S Controls during construction, Dobrinski Brothers will fix the damages
and bill Barbaron Inc. accordingly. Hourly Rate sheet will apply to repair
work. Repair work MUST be approved by Golf Strategies & Blue Ridge
Real Estate prior to any work be completed.
4.
The price for the construction of
the basins does not include a clay core for the berms, because it was not in
the specifications from RKR Hess and Associates. If clay liner is needed it
MUST be pre-approved by Golf Strategies.
5.
On-Site office is available and
provided by Blue Ridge.
6.
Proposal is based on mobilization
with work continuing without any interruptions from beginning to end.
7.
All insurance certificates shall
list Blue Ridge Real Estate Company as additional insured.
8.
The Project Schedule shall be
planned and approved by Golf Strategies & Blue Ridge to meet all aspects of
the project such as quality of work, environmental, construction, and financial
concerns. Dobrinski Brothers shall furnish equipment and labor, complete in
accordance with the above specifications.
9.
Blue Ridge Real Estate Company
shall retain ten-percent of the contract price until such time as the project
has been approved in writing by Golf Strategies and Blue Ridge Company.
Ten-percent shall be withheld from each progress payment during the term of
this Agreement.
Initialed:
/s/ KD
/s/ EDD
/s/ TW
Dobrinski
Blue Ridge
Golf Strategies
The attached sheet shows the materials
needed. ALL material MUST have prior approval from Golf Strategies BEFORE
material are purchased.
The following information is to be followed for grass
seeding.
Temporary Seeding:
Penndot Formulas E: Oats March 15th thru
June 1St - Apply at a rate of 50 Ibs per acres
Annual Rye- 100 % June 1- Oct 15th
Permanent Seeding:
Penndot Formula B: Perennial Ryegrass Mixture 20%
Kentucky Bluegrass Mixture 50%
Magic Chewing Fescue- 30%
Apply at a rate of 21 Ibs per 1000 Sq.
feet (3 to 1 & steeper, including basin side slopes.)
Any modification of seeding must be in
writing and will come directly from Golf Strategies
Complete Construction of Erosion and Sedimentation Controls
$1,220,114.30
Acceptance of Proposal: The above prices, specifications,
and conditions are satisfactory and hereby accepted: Dobrinski Brothers is
authorized to do the work as specified under the direction of Golf Strategies
LLC.
Authorized Signature:
/s/ Kevin Dobrinski
Dobrinski Brothers
Kevin Dobrinski
Vice President
Date of Acceptance:
/s/ Eldon D. Dietterick
4-13-05
Blue Ridge Real Estate, Co.
Eldon D. Dietterick
Executive VP & Treasurer
/s/ Tom Wheary
Golf Strategies, LLC
Tom Wheary
President
Pg. 3
AIA
Document A101-1997
Standard Form
of Agreement Between Owner and Contractor where the basis
of payment is a STIPULATED SUM
AGREEMENT made as of the Thirteenth day of
April in the year of Two Thousand and Five
(In words,
indicate day, month and year)
BETWEEN the Owner:
(Name, address and other information)
Blue Ridge Real
Estate Company
P.O. Box 707
Route 940 and
Mosey Wood Road
Blakeslee, PA 18610
and the Contractor:
(Name, address and other information)
Dobrinski
Brothers
Incorporated
RR # 1 Box 482B
Falls, PA 18615
This document has
important legal consequences. Consultation with an attorney is encouraged with
respect to its completion or modification.
AIA Document A201-1997,
General Conditions of the Contract for Construction, is adopted in this
document by reference. Do not use with other general conditions unless this
document is modified.
This document has been
approved and endorsed by The Associated General Contractors of America.
The Project is: (Name
and location)
Jack Frost
National Golf Club
Boulder Creek
Resorts
Blakeslee, PA
The Architect is:
(Name, address and other information)
Golf Strategies,
LLC
737 Main Street
Suite 201
Safety Harbor,
FL 34695
The Owner and Contractor agree as follows.