Exhibit
10.6
Construction
Agreement
Party A:
Shannxi Kai Da Lv You Gu Wen You Xian Gong Si
Address:
Hongguan Road, Xi’an City.
Postcode:710086
Telephone:029-84368561
Party B: Wu,
Lianshe
Address: Qindu
District, Xianyang City, Shaanxi Province
Postcode:
712000
ID Card
No.:610402560325181
After the
consultation, Party B takes the design task of 4A level
reconstruction project of the Theme Park of E Pang Gong Palace, and
the two parties come into the agreement as following:
1. The reconstruction
place, area and the design contents:
1.1
The reconstruction project place: the Theme Park and
hotel
1.2 The reconstruction area:
540,000 ㎡.
1.3
The design contents and standard: international 4A
level.
2. The obligations of
Party A:
2.1 Providing Party B with the
prospectus proved by the relevant superior governmental department
before October 1. 2005.
2.2
Providing Party B with he document of agreement about raw material
(or resource report authorized), fuel, water, electricity, traffic
and so on, the reconnaissance data that can satisfy the original
planning requirement, the technique data through scientific
research..
2.3
Being responsible for the approval for every stage of the
reconstruction.
2.4
Being responsible for the fees of trip and bussiness caused by the
outside experiment because of the technical need.
2.5
Providing Party B the necessary room for living and dining (fees
beared by Party B).
2.6
Protecting the intellectual property of Party B and not delivering
it to any third party.
3. The obligations of
Party B:
3.1 Selecting the experienced
designing staff for the project who succeeded many
designs.
3.2
Providing Party A with the designing document within the scheduled
time.
3.2.1 Delivering the
draft plan (4 versions) of the reconstruction project before
October 31, 2005.
3.2.2 Delivering the
final plan (4 versions) of the reconstruction project before
November 20, 2005.
3.2.3 Delivering the
working drawing (4 versions) together with the final plan of the
reconstruction project before October 31, 2005. if Party A needs
more copies of the drawing and the making mode, both parties can
consulting for the additional fees.
3.2.4 Delivering the
budget document of the reconstruction project and the relevant
material before November 25, 2005.
3.3
C