50 of the Top 250 law firms use our Products every day
MN River Water Supply
Facility
Granite Falls Energy, LLC
Granite Falls, MN
THIS AGREEMENT
is dated as of the 16th day of August in the year 20
06 by and between Granite Falls Energy, LLC (hereinafter
called OWNER) and Wagner Construction (hereinafter called
CONTRACTOR).
OWNER and
CONTRACTOR, in consideration of the mutual covenants hereinafter
set forth, agree as follows:
CONTRACTOR
shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
|
|
A.
|
|
Construction of piping from existing
Granite Falls Energy, LLC watermain to the raw water pumping
station and associated work.
|
The Project has
been designed by Bolton & Menk, Inc., Consulting Engineers,
1960 Premier Drive, Mankato, MN 56001, who is hereinafter called
ENGINEER and who is to act as OWNER’S representative, assume
all duties and responsibilities and have the rights and authority
assigned to ENGINEER in the Contract Documents in connection with
completion of the Work in accordance with the Contract
Documents.
ARTICLE 3.
CONTRACT TIME.
3.1. The
project will be operational by December 31, 2006. Final
restoration work will be completed by May 2007.
ARTICLE 4.
CONTRACT PRICE.
|
4.1.
|
|
OWNER shall pay CONTRACTOR for
completion of the Work in accordance with the Contract Documents in
current funds as follows:
|
|
|
|
|
|
|
|
|
Lump Sum of
$251,168.50 (Two hundred fifty-one thousand one hundred sixty-eight
and 50/100 DOLLARS)
|
|
|
|
|
( With Bid
Schedule Attachment)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M21.38035 — Granite Falls Energy,
LLC
|
|
AGREEMENT
|
MN River Water Supply Facility-Granite Falls,
MN
|
|
PAGE 1
|
ARTICLE 5.
PAYMENT PROCEDURES.
CONTRACTOR
shall submit Applications for Payment on a monthly basis for the
work completed. Applications for Payment will be processed by
ENGINEER to the OWNER. T
|